Larsen and Toubro to Start Construction of Dhubri-Phulbari Bridge


STAFF REPORTER
GUWAHATI, Jan 15: Larsen and Toubro (L&T) is going to start the construction of the Rs 3165.99-crore JICA-funded four-lane bridge over the Brahmaputra between Dhubri and Phulbari. The NHIDCL-Northeast (National Highway Infrastructure Development Corporation) has issued the work order to this regard recently through tendering.
While JICA (Japan International Cooperation Agency) is a Japanese government agency, NHIDCL is a fully-owned company of MRT&H (Ministry of Road Transport & Highways).
The foundation stone of the project will be laid either in January-end or in early February, 2021. The original sanctioned cost of the bridge was Rs 4997.04 crore which has been awarded to L&T at Rs 3165.99 crore, after tendering. The target completion of the bridge is September, 2028.

Related Keywords

Japan , Bangladesh , India , Tripura , Rangpur , Phulbari , West Bengal , Nepal , Lohit River , India General , Kolkata , Guwahati , Assam , Dhubri , Bhutan , Japanese , Dhola Bhupen Hazarika Setu , Pankaj Singh , Japan International Cooperation Agency , Regional Office , Nhidcl Infrastructure Development Corporation , Road Transport , Executive Director Pankaj Singh , North Bank , South Bank , Bhupen Hazarika Setu , Larsen And Toubrol Ampt , Brahmaputra , ஜப்பான் , பங்களாதேஷ் , இந்தியா , திரிபுரா , ரங்க்பூர் , புள்பரி , மேற்கு பெங்கல் , நேபால் , லோஹித் நதி , இந்தியா ஜநரல் , கொல்கத்தா , கூவடி , அசாம் , துப்ரி , பூட்டான் , ஜப்பானிய , தோலா பூபன் ஹசரிகா செத்து , பங்கஜ் சிங் , பிராந்திய அலுவலகம் , சாலை போக்குவரத்து , நிர்வாகி இயக்குனர் பங்கஜ் சிங் , வடக்கு வங்கி , தெற்கு வங்கி , பூபன் ஹசரிகா செத்து , பிரம்மபுத்ரா ,

© 2024 Vimarsana

vimarsana.com © 2020. All Rights Reserved.