Minister Mahaseth directs for completion of Kamala River Bridge by June 30

Card image cap

Deputy Prime Minister and Minister for Physical Infrastructure and Transport, Raghubir Mahaseth, today inspected the under-construction bridge over the Kamala River, directing the construction company to conclude the project by coming June.

Related Keywords

Siraha , Nepal General , Nepal , Dhanusha , Raghubir Mahaseth , , Prime Minister , Physical Infrastructure , Kamala River , Postal Highway ,

© 2024 Vimarsana

vimarsana.com © 2020. All Rights Reserved.