vimarsana.com

Page 4 - இஸ்ரேலி அமைச்சகம் ஆஃப் ஆற்றல் News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Eco Wave Power Secures Final Engineering Coordination Permit for Cement Works and Floaters Installation for the EWP-EDF One Project

Share this article STOCKHOLM, Feb. 8, 2021 /PRNewswire/ In a significant regulatory milestone, Eco Wave Power (EWPG Holding AB, Stock Symbol: ECOWVE) is pleased to announce that today it secured the engineering coordination permit from the Municipality of Tel-Aviv Jaffa (permit number 2020-3249) needed for the cement works and   installation of ten floaters for the EWP-EDF One wave energy project in the Port of Jaffa, Israel. This permit allows Eco Wave Power to proceed with the actual installation of the project in the seaside of the breakwater, which shall include cement works for the breakwater s reinforcement and the installation of 10 floaters, on 30 linear meters of a pre-existing breakwater within the port, having an installed capacity of 100 KW. Each floater will have a surface area of 8.54 square meters. All civil works were planned and will be supervised by Alex Gleizer, a civil engineer with 25 years of experience, executing projects for the Israeli Railway Compa

GenCell G5 Long-Duration UPS receives approval from Israel Ministry of Energy

th Jan). The announcement follows a permit awarded from the State of Israel’s Electric Authority which authorises the use of the solution at a mission-critical facility. The permit is the first of its kind in Israel for a power generator that is fuelled by hydrogen. “GenCell is extremely pleased to receive the first-ever permit from the Israeli Ministry of Energy to authorise the use of a hydrogen fuel cell solution to supply backup power to a mission-critical application, thus being formally recognised as a satisfactory alternative to traditional fossil fuel backup power generators,” said Rami Reshef, CEO, GenCell Energy.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.