vimarsana.com

Page 3 - நிறை விரைவான போக்குவரத்து வரி News Today : Breaking News, Live Updates & Top Stories | Vimarsana

First Set of Metro Trains: 3 of 6 coaches shifted to Diabari depot

First Set of Metro Trains: 3 of 6 coaches shifted to Diabari depot Three coaches like this one were taken to the metro rail depot in the capital’s Diabari yesterday. Photo: Collected Staff Correspondent Staff Correspondent Three coaches, out of six of the first set of metro trains, have been shifted to the metro rail depot in Dhaka s Diabari yesterday. The next three coaches are expected to be shifted today, ABM Arifur Rahman, a project manager of Mass Rapid Transit Line or MRT-6, told The Daily Star. They [coaches] were kept inside the workshop s inspection area. Apart from the individual test of the coaches, integrated test would be carried out, he added.

48 involved with metro rail project diagnosed with Covid-19 in last 7 days

48 involved with metro rail project diagnosed with Covid-19 in last 7 days The country s first metro rail formally known as Mass Rapid Transit (MRT). Star file photo Star Digital Report Star Digital Report At least 48 people involved with country s first metro rail project got infected with Covid-19 in last seven days. With them, in total 518 people got infected with Covid-19 so far, MAN Siddique, managing director of Dhaka Mass Transit Company Ltd, told reporters today at a virtual press briefing. However, work of the fast track project is going on in full-swing in two shifts day and night, he said.

Lion Industries bets on hot rolled coil revival for turnaround

LION Industries Corp Bhd, controlled by tycoon Tan Sri William Cheng Heng Jem, is banking on a return to hot rolled coil (HRC) manufacturing to turn its fortunes around. The group, one of the country’s oldest steel makers, has been loss-making for the past two financial years amid intense competition and slowing market growth. Last December, the group announced plans to restart production of HRC in the second quarter of 2021 with a production capacity of 2.5 million to 3 million tonnes a year. “Our plans to restart the HRC plant is part of the group’s turnaround plans, which we expect to contribute positively to the results,” says a Lion Industries spokesman in an email response to The Edge.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.