vimarsana.com

Page 6 - புதியது இங்கிலாந்து சுத்தமான ஆற்றல் News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Court puts halt on construction of $1B Maine power corridor

PORTLAND, Maine (AP) A federal appeals court has halted construction of a $1 billion power transmission line corridor through Maine to give conservation groups time to make their case against.

In the Maine woods, preparations signal imminent start of CMP power line project

Read Article Wood-harvesting equipment, excavators and other machines that will be used to clear the corridor for the New England Clean Energy Connect project are arrayed Friday at the so-called Marshall Yard, off Route 201 near West Forks. At the rear, massive stacks of wooden erosion-control mats await transport into the forest. Photo courtesy of Aaron Turkel JOHNSON MOUNTAIN TOWNSHIP Obscured by a swirling snow squall, an amphibious off-road transporter with 5-foot-high tires maneuvered Friday along the Maine ITS 89 snowmobile trail at the base of Coburn Mountain. At a junction, two workers from Northern Clearing, a Wisconsin-based right-of-way contractor, stepped into the wind and 11-degree cold and secured a sign and pink flagging tape to a small tree.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.