Hydro-Québec peut construire le NECEC aux États-Unis ledevoir.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from ledevoir.com Daily Mail and Mail on Sunday newspapers.
PORTLAND, Maine (AP) A federal appeals court has halted construction of a $1 billion power transmission line corridor through Maine to give conservation groups time to make their case against.
Read Article
Wood-harvesting equipment, excavators and other machines that will be used to clear the corridor for the New England Clean Energy Connect project are arrayed Friday at the so-called Marshall Yard, off Route 201 near West Forks. At the rear, massive stacks of wooden erosion-control mats await transport into the forest. Photo courtesy of Aaron Turkel
JOHNSON MOUNTAIN TOWNSHIP Obscured by a swirling snow squall, an amphibious off-road transporter with 5-foot-high tires maneuvered Friday along the Maine ITS 89 snowmobile trail at the base of Coburn Mountain. At a junction, two workers from Northern Clearing, a Wisconsin-based right-of-way contractor, stepped into the wind and 11-degree cold and secured a sign and pink flagging tape to a small tree.