vimarsana.com

Page 2 - பெஞ்ச்மார்க் தாதுக்கள் உளவுத்துறை News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Blencowe Resources Plc (LSE:BRES) | RNS | Blencowe Resources - Stage Two Drilling Program Commences

Uganda. ·    Fully funded through existing cash resources. ·    Previously drilled high grade zones in Northern Syncline and Camp Lode to be included in new upgraded resource. ·    Additional in-fill drilling to provide basis for mine planning, delivery of geotechnical and other information, for inclusion in Pre-Feasibility Study (PFS).   Blencowe Resources Plc ( Blencowe Resources or the Company ) (LSE: BRES) is pleased to announce the commencement of the Stage Two drilling program at Orom-Cross, designed to in-fill the recently announced JORC Resource and upgrade substantial tonnes into the Indicated and Measured categories. This additional program will progress Orom-Cross along its development path towards first production, and will be executed using the Company s in-country technical partners, ADT Drilling and Minrom Consulting. Additional resources will also be targeted in the current programme, with drilling also focusing on proven high grade areas, as yet

National View: Biden s jobs plan must be built from the mine up

National View: Biden s jobs plan must be built from the mine up From the column: From government to the automotive and tech industries, the troubling reality is we are financing enormous demand for material commodities but not their supply. Written By: Rich Nolan | × A “We Support Mining” banner hangs over a street in Aurora in this News Tribune file photo. President Joe Biden is right: The state of U.S. infrastructure is a catastrophe crying out for bold action. The heart of his jobs plan, aimed at rebuilding and modernizing America’s infrastructure and reshoring its industrial base, is the ambition we should hold ourselves to.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.