Power Supply In Kumasi Normalised
Power Supply In Kumasi Normalised
Stay updated with breaking news from Ameri Power Plant. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
705 The Bui Power Authority (BPA) says the Ghana Grid Company Limited (GRIDCo) misinformed the Minister of Energy and Ghanaians, when it said the Bui Power Plant had been shut down due to low level of water and hence the intermittent power supply in the central part of Ghana and especially in Kumasi. Following the intermittent power supply in recent weeks, GRIDCo at a press briefing on the issue on April 1, 2021 said the Bui Power Plant had been shut down because of low water in the dam and therefore all the power the country needed was being generated from the coast, Tema and Takoradi.
Graphic Online BY: Getrude Ankah Nyavi 30.5k Shares 705 The Ghana Grid Company Limited (GRIDCo) has explained why the Ameri Power Plant is being relocated from Aboadze to Kumasi in the Ashanti Region. According to GRIDCo, the move is to help use the 250 megawatts plant to stabilise the power situation in the central part of Ghana. Bui Power Authority (BPA) or the Bui Hydroelectric Power Plant happens to be the only power generation plant which is located in the central part of Ghana. All the other generating power plants are located in the southern and coastal parts of Ghana. Bui supplies ...