Advertisement Tekmar Energy Limited (Tekmar Energy), a Tekmar Group company, has announced a contract award from cable manufacturer, ZTT, to supply its Cable Protection Systems (CPS) for the Gode Wind 3 high-voltage grid connection project. The 16 km long submarine cable is scheduled for installation in 2023 and will connect the 242 MW Gode Wind 3 Offshore Wind Farm to TenneT’s extra high-voltage grid via the DolWin Kappa HVDC converter station, and the associated DolWin 6 grid connection in Germany. Tekmar Energy’s CPS and bespoke Bellmouths will be installed to protect the cable as it t...