Investegate |TOTAL Announcements | TOTAL: Angola: Total Starts Production From Zinia Phase 2, Successful Short-cycle Development on Block 17
Angola: Total Starts Production From Zinia Phase 2, Successful Short-cycle Development on Block 17 TOTAL Total (Paris:FP) (LSE:TTA) (NYSE:TOT), operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency, announce the start of production from Zinia Phase 2 short-cycle project, connected to existing Pazflor’s FPSO (Floating Production, Storage and Offloading unit). The project includes the drilling of nine wells and is expected to reach a production of 40,000 barrels of oil per day by mid-2022. Located in water depths from 600 to 1,200 meters and about ...