Final 2023 Drill Hole Results for CV5 at Corvette including 133.9 m at 1.21% Li2O and Extending Strike to 4.6 km
/PRNewswire/ - Highlights Strong assay results over wide intervals from infill drilling at CV5. 133.9 m at 1.21% Li2O, including 41.5 m at 1.52% Li2O; and 42.2...