Genesis Energy half-year profit falls 73 percent
The result comes on the back of the higher cost of generation, an outage at its major Huntly station, and lower gas production.
Stay updated with breaking news from Malcolm Johns. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The result comes on the back of the higher cost of generation, an outage at its major Huntly station, and lower gas production.
National grid operator Transpower says New Zealand needs to up its investment in flexible power systems if it is to meet increased demand this winter. The...
Nine months into his job at the helm of Genesis Energy, Malcolm Johns — former chief executive of Christchurch Airport — says the level of risk inherent in...
The Huntly power station would still be needed for peak demand, but coal use would be reduced and replaced with biomass and possibly hydrogen, while gas would be needed for the transition, Genesis said.
Genesis Energy said it planned to use profits from the Kupe gas field to support a $1.1 billion programme to build new renewable generation and grid-scale...