BELARUSTV July 2, 2024
Using a metal probe, and we check the subsidence, how deep it goes into the ground, but if the depth is half a meter or more, then in this place it is necessary to lay a control well or a zhizher, now here it is. It falls deep, it will a control well has been laid, with the help of a drill we will examine the strata, study the structure of the soil, which will allow us to determine whether they dug here or not, the control section so far shows that there was soil. Or not, for us this is always the result, because we can make sure that no burial was carried out in a given area of the area...