Central Petroleum Limited (ASX:CTP) Project Range Update - ABN Newswire (@ABN_Newswire)
Central Petroleum Limited (ASX:CTP) Project Range Update Three Well Pilot Program All three wells have been operating continuously since commencement of pumping on 14 June 2021. Well drawdown was gradually increased via a controlled reduction in the fluid level, which is now just above the pumps. Gas breakthrough was observed in the annulus immediately upon commencement of pumping. This was earlier than expected and indicates the presence of coals that are fully saturated with gas. Shortly after pumping commenced, sufficient gas was being produced to sustain the flare. After around f...