Steep ramp at Bhandari RoB adds to chaos
Unregulated flow of traffic and non-compliance of rules create possibilities of chaos and mishaps on the ever busy Bhandari railway overbridge (ROB).
Stay updated with breaking news from Partap Nagar. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Unregulated flow of traffic and non-compliance of rules create possibilities of chaos and mishaps on the ever busy Bhandari railway overbridge (ROB).
Manjit Singh, a resident of Partap Nagar, was duped of Rs 2.7 lakh by cyber criminals, one of whom posed as his relative staying in Canada.
A bedsheet and polythene bags used to dispose the body of a 20-year-old man killed in Delhi recently led the police to the five suspected killers who run a bakery, officials said on Monday.
JAMMU: Chief Engineer (Distribution) JPDCL Jammu has informed that the power supply to Ramgarh, Rangoor and adjoining areas shall remain affected on January 02 from 9 am to 3 pm.
Power shutdown JAMMU: To execute branch cutting work, the power supply to Akhnoor Road, Bharat Nagar, Kamla Palace, Poonch House, Part of Talab Tillo and their adjoining areas shall remain affected on May 04 from 10 am to 2 pm. Similarly, for erection of 9 mts PCC Pole in 11 KV Line and Line Crossing, the power supply to Babliana and its adjoining areas shall remain affected on May 04 and 06 from 9 am to 1 pm. Meanwhile, to carry out branch cutting under the corridor of 66 KV Pathankot Katua line and routine maintenance of 1×10 MVA 66/11 KV Receiving Station Hatlimorh, the power supply to C...