Bike lanes approved for Jubilee and Theriault
Roadways to be reduced from four lanes to three, with a centre turning lane
Stay updated with breaking news from Tatham Engineering. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Roadways to be reduced from four lanes to three, with a centre turning lane
Article content The move, bringing the value of the contract awarded to Tatham Engineering Limited to $111,240, plus HST, was approved during Tuesday’s meeting. We apologize, but this video has failed to load. Try refreshing your browser. Upgrade for Schumacher pumping station Back to video “That station (located at the McIntyre Community Building) serves all the gravity sewers from Schumacher,” said Patrick Seguin, the city’s director of Public Works and Engineering. “They get pumped up to around (Highway) 655 and then gravity feeds the wastewater plant, so that is a crucial lift...
Article content Residents have until Friday to share their thoughts on recommended changes – including new roundabouts – to Lakeshore and Pinewood Park drives. The City of North Bay is currently looking at upgrading 3.7 kilometres of roadway along Lakeshore Drive and Pinewood Park Drive, from Ferris Drive to approximately 1.04 kilometres south of Decaire Road. We apologize, but this video has failed to load. Try refreshing your browser. Deadline approaching for proposed roundabout feedback Back to video Council awarded a $222,145 contract, plus HST, last summer to Tatham Engineering Ltd...