Heavy rain leads to traffic congestion in Mumbai | Mumbai News
Heavy rain and resultant water logging led to slow-moving traffic at several places in Mumbai on Saturday.
Stay updated with breaking news from Western Express. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Heavy rain and resultant water logging led to slow-moving traffic at several places in Mumbai on Saturday.
Mumbai: The BMC is planning to construct an elevated corridor using cable-stayed bridges to alleviate the persistent congestion on the Western Express Highway and enable smooth vehicle movement between Mahim and Dahisar. In order to achieve this, they intend. This ambitious project, initiated under the guidance of CM Shinde, aims to implement effective access control measures., Mumbai News, Times Now
Mumbai Traffic Police (MTP) confirmed the removal of the truck and the resumption of smooth traffic at 9:41 am through a tweet.
It is reported that this ambitious project, estimated to cost about Rs 5,500 crore, is being carried out on the directions of Maharashtra Chief Minister Eknath Shinde
This line is fully elevated and connects Western Express and Eastern Express Highways.