vimarsana.com


BCPL Railway Infrastructure spurted 2.50% to Rs 81.85 after the company received a Letter of Acceptance (LOA) from Railway Vikas Nigam (RVNL).
The LOA has been received for deployment of 25 KV OHE Gang to complete the residual overhead (OHE) adjustment works and provision of bonding/earthing work and safety related works in section Sreerampur Assam - Fakiragram of NF Railway. It is expected to be executed over a period of 45 days. The recent order adds to the strong orderbook position for the company of around Rs 165 crore.
On the technical front, the stock's RSI (relative strength index) stood at 41.922. The RSI oscillates between zero and 100. Traditionally, the RSI is considered overbought when above 70 and oversold when below 30.

Related Keywords

Fakiragram ,Assam ,India , ,Nf Railway ,Railway Infrastructure ,Bcpl Railway Infrastructure ,Railway Vikas Nigam ,Sreerampur Assam ,Capital Market ,Programming Languages ,Jbcpl ,University Of Cambridge Computer Laboratory ,பக்கிராக்ராம் ,அசாம் ,இந்தியா ,ந்ஃப் ரயில்வே ,ரயில்வே உள்கட்டமைப்பு ,பிசிபிள் ரயில்வே உள்கட்டமைப்பு ,ரயில்வே விகாஸ் நீகம் ,ஸ்ரீரம்பூர் அசாம் ,மூலதனம் சந்தை ,ப்ரோக்ராமிஂக் மொழிகள் ,பிசிபிள் ,பல்கலைக்கழகம் ஆஃப் கேம்பிரிட்ஜ் கணினி ஆய்வகம் ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.