vimarsana.com


Commercial operation at NTPC's Gadarwara project unit to begin from March 1
SECTIONS
Last Updated: Feb 26, 2021, 04:28 PM IST
Share
Synopsis
"We wish to inform that unit-2 of 800 MW of Gadarwara Super Thermal Power Station (2 x 800 MW) is hereby declared on commercial operation with effect from 00:00 hours of 01.03.2021," NTPC said in a BSE filing.
Agencies
With this, the commercial capacity of NTPC and NTPC group will become 52,115 MW and 64,880 MW, respectively, the power producer said.
State-owned
The project is located in Narsinghpur district of Madhya Pradesh.
"We wish to inform that unit-2 of 800 MW of Gadarwara Super Thermal Power Station (2 x 800 MW) is hereby declared on commercial operation with effect from 00:00 hours of 01.03.2021," NTPC said in a BSE filing.

Related Keywords

Madhya Pradesh ,India ,Narsinghpur ,Gadarwara , ,Gadarwara Super Thermal Power Station ,மத்யா பிரதேஷ் ,இந்தியா ,னாற்சீங்க்புர் ,கதர்வர ,கதர்வர அருமை வெப்ப பவர் நிலையம் ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.