vimarsana.com


Kelana Jaya LRT line returns to normal operation (Updated)
28 May 2021 / 19:03 H.
- Bernama
KUALA LUMPUR: The Kelana Jaya Light Rail Transit (LRT) service, which was affected by a train collision incident last Monday, has returned to its normal operation at 3.45pm today.
Transport Minister Datuk Seri Dr Wee Ka Siong said repair and clean-up works at the affected track have concluded.
This includes the installation of the 28-metre long linear heat detection cable, a critical element in train operation, which was completed at 2pm.
“As all the works requested by the Land Public Transport Agency (APAD) have been fulfilled, APAD director-general has issued an approval letter for the service to resume operation.

Related Keywords

Kampung Baru ,Terengganu ,Malaysia ,Kuala Lumpur ,Lampang ,Malaysia General ,Dang Wangi ,Land Public Transport Agency ,Sops Of The Movement Control Order ,Kelana Jaya Light Rail Transit ,Movement Control Order ,Ampang Park ,Pasar Seni ,கம்புங் பாரு ,தேறேன்க்கனு ,மலேசியா ,குவாலா லம்பூர் ,ஆம்பாங் ,மலேசியா ஜநரல் ,டங் வாங்கி ,ஸாப்ஸ் ஆஃப் தி இயக்கம் கட்டுப்பாடு ஆர்டர் ,இயக்கம் கட்டுப்பாடு ஆர்டர் ,ஆம்பாங் பூங்கா ,பசார் செனி ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.