Kelana Jaya LRT line returns to normal operation (Updated)
28 May 2021 / 19:03 H.
- Bernama
KUALA LUMPUR: The Kelana Jaya Light Rail Transit (LRT) service, which was affected by a train collision incident last Monday, has returned to its normal operation at 3.45pm today.
Transport Minister Datuk Seri Dr Wee Ka Siong said repair and clean-up works at the affected track have concluded.
This includes the installation of the 28-metre long linear heat detection cable, a critical element in train operation, which was completed at 2pm.
“As all the works requested by the Land Public Transport Agency (APAD) have been fulfilled, APAD director-general has issued an approval letter for the service to resume operation.