A look at the boiler plant design defects and the status of rectification work in progress at these coal-fired power stations.
By Chris Yelland
17 Mar 2021 
08:37 
Image: Supplied
The Medupi and Kusile projects involve the construction of two 4 800 MW, coal-fired, direct dry-cooled power stations. The Medupi site is close to Eskom’s Matimba power station in the Lephalale district of Limpopo province. The Kusile site is close to Eskom’s existing Kendal power station in the Nkangala District of Mpumalanga province.
An article in Engineering News on February 1, 2019 summarised a number of technical defects identified by Eskom at Medupi and Kusile that were resulting in serious underperformance at the power stations. The generation units handed over for commercial service were unable to operate at full load and were experiencing frequent planned and unplanned outages.

Related Keywords

,Eskom ,Nkangala District ,Engineering News ,Power Station Design ,Mitsubishi Hitachi Power Systems Africa ,Medupi Unit ,பொறியியல் செய்தி ,பவர் நிலையம் வடிவமைப்பு ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.