Mandalay Resources Corporation
Mandalay Resources Corporation Intersects 0.11 Metres of 460.5 g/t Gold and 0.20 Metres of 165.1 g/t Gold in Initial Stepout Drill Hole Under the Youle Deposit
Mandalay Resources Corporation Intersects 0.11 Metres of 460.5 g/t Gold and 0.20 Metres of 165.1 g/t Gold in Initial Stepout Drill Hole Under the Youle Deposit
TORONTO, Jan. 29, 2021 (GLOBE NEWSWIRE) Mandalay Resources Corporation ( Mandalay or the Company ) (TSX: MND, OTCQB: MNDJF) is pleased to provide preliminary details on the initial intercepts into a newly discovered veining horizon underneath and related to the Youle deposit at its Costerfield operations (Victoria, Australia).
Highlights:
460.5 g/t gold over a partially recovered true width of 0.11 m in BC176; and
(2)
TORONTO, Jan. 29, 2021 (GLOBE NEWSWIRE) Mandalay Resources Corporation ( Mandalay or the Company ) (TSX: MND, OTCQB: MNDJF) is pleased to provide preliminary details on the initial intercepts into a newly discovered veining horizon underneath and related to the Youle deposit at its Costerfield operations (Victoria, Australia).
Highlights:
460.5 g/t gold over a partially recovered true width of 0.11 m in BC176; and
165.1 g/t gold over a true width of 0.20 m in BC176W1 wedge hole off BC176.
Notes:
True width of BC176 is quoted from only recovered core. There is approximately an additional 40% of veined core that was not recovered.
Further intercept details can be found in Table 1 in the Appendix to this document.
The Board of Xtract Resources Plc ( Xtract or the Company ) is pleased to provide an update regarding progress of the second hole in the Phase One diamond drilling programme at the Racecourse Mineral Resource on the Bushranger porphyry copper-gold exploration project located in the Lachlan Fold Belt ( LFB ), New South Wales, Australia. · Drilling of the second hole of the Phase One Drilling Programme at the Racecourse Mineral Resource on the Bushranger Project, has continued to 405m out of a planned hole depth of about 750m · Hole BRDD-21-002 is angled at -80 degrees and is offset from strike with the aim of crossing through the down-plunge extension of the deposit at depth
Tinka Drills 8 Metres Grading 31% Zinc & 225 Grams Per Tonne Silver at Ayawilca theusnews.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from theusnews.com Daily Mail and Mail on Sunday newspapers.
Tinka Resources Ltd.: Tinka Drills 8 Metres Grading 31% Zinc & 225 Grams Per Tonne Silver at Ayawilca
Tinka or the
BVL:TK)(
OTC PINK:TKRFF) is pleased to announce assay results for seven drill holes from the ongoing resource expansion and infill drill program at the Ayawilca project in Peru.
Hole A20-177 intersected very high grade vein-style zinc-silver-lead mineralization outside of the zinc resource at about 100 metres depth. Three holes (A20-178, 177 & 175) also successfully intersected high grade manto-style zinc mineralization at the Camp area. Hole A20-179 was an infill hole at the West area which intersected two wide zones of mineralization with better than expected zinc grades. The other three holes intersected extensions of zinc-rich mineralization at the South area (holes A20-176, 174, 172). Tinka has now completed 6,500 metres of the planned 7,500 metres in the resource drilling program. Sixteen holes have been completed with two in progress (A21-185 & 186) and at