Exploration Continues on Gold-Silver Targets Identified in Phase-1 Diamond Drilling VANCOUVER, BC / ACCESSWIRE / May 26, 2021 / Brigadier Gold Limited (the "Company" or "Brigadier") (TSXV:BRG)(FSE:B7LM)(OTC
Brigadier Makes Copper Discovery at Picachos theusnews.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from theusnews.com Daily Mail and Mail on Sunday newspapers.
Brigadier Announces Agreement for Advertising Services tennesseedaily.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from tennesseedaily.com Daily Mail and Mail on Sunday newspapers.
Brigadier Gold Limited: Brigadier Completes Phase One Exploration at Picachos With Multiple Follow-up Drill Targets Assays Pending for Prospective El Placer Norte Target where sampling returned up to 12.79 g/t Gold
Company or
Brigadier ) (TSXV:BRG)(FSE:B7LM)(OTC PINK:BGADF) is pleased to provide a summary of the recently completed phase-one exploration program at it Picachos gold-silver-copper project Sinaloa, Mexico (the
Picachos Project ,
Picachos or the
Property ). In total 5057 metres of diamond drill was completed in 50-holes across eleven different prospects on the Property, most of which were never previously drill tested. Remaining assays are anticipated to be received in June.
Brigadier Completes Phase One Exploration at Picachos With Multiple Follow-up Drill Targets Assays Pending for Prospective El Placer Norte Target where sampling returned up to 12.79 g/t Gold
ACCESSWIRE
VANCOUVER, BC / ACCESSWIRE / May 11, 2021 / Brigadier Gold Limited (the
Company or
Brigadier ) (TSXV:BRG)(FSE:B7LM)(OTC PINK:BGADF) is pleased to provide a summary of the recently completed phase-one exploration program at it Picachos gold-silver-copper project Sinaloa, Mexico (the
Picachos Project ,
Picachos or the
Property ). In total 5057 metres of diamond drill was completed in 50-holes across eleven different prospects on the Property, most of which were never previously drill tested. Remaining assays are anticipated to be received in June.