July 17, 2010
Thursday, when the new pollution from this well stops for good. >> how much longer until the first relief well gets to the point of interception? >> bp is optimistic by the end of july, the end of this month, a week or two ahead of the original schedule, that first the deeper well which right now is at 17,840, it will intercept with the existing well, 24 feet away at this point but slow going at this end of the line because they drill a little, pull that drilling equipment out, drop down the mag...