vimarsana.com

Latest Breaking News On - Abujar gold mine processing plant - Page 1 : vimarsana.com

Tietto Minerals Ltd infill drilling at Abujar returns more high-grade gold with results up to 9 metres at 61 97 g/t

Tietto Minerals Ltd hits AG South bonanza at Abujar with up to 5 metres at 109 06 g/t gold

Tietto Minerals hits AG South bonanza at Abujar with up to 5 metres at 109.06 g/t gold The latest results are flagged for inclusion in the next update to the 3.2 million-ounce Abujar resource, due at the end of the current quarter. Diamond core of 56.1 millimetres in diameter showing visible gold intercepted at 99 metres. Tietto Minerals Ltd (ASX:TIE) has received bonanza grade gold results from infill drilling at Abujar‐Gludehi (AG) deposit, part of its 3.02-million-ounce Abujar Gold Project in Côte d’Ivoire, West Africa, which is on track to be West Africa’s next gold mine. The company has hit a project‐best gold intercept at AG South of 5 metres at 109.06 g/t gold from 99 metres including 1-metre at 532.05 g/t.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.