Pilot Project achieved 90% lithium recoveries at concentrations as low as 34 mg/L 97% recoveries achieved using 120 mg/L concentrations under simulated operating conditions Operating costs under CAD$4,000 per tonne at 120 mg/L expected to drive. - Veroeffentlicht am 24.05.2023