vimarsana.com

Latest Breaking News On - Bombardier innovia metro - Page 1 : vimarsana.com

LRT Kelana Jaya Line undergoing RM800m mid-life refurbishment, 19 new train sets coming in Q4 2023

LRT Kelana Jaya Line undergoing RM800m mid-life refurbishment, 19 new train sets coming in Q4 2023
paultan.org - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from paultan.org Daily Mail and Mail on Sunday newspapers.

Two new state-of-the-art trains now running on Kelana Jaya LRT line

First two train sets under KLAV27 project begin operations | Malaysia

Sunday, 27 Jun 2021 03:06 PM MYT A passenger dons a face mask during a ride on the LRT train in Kuala Lumpur June 1, 2021. Picture by Firdaus Latif Follow us on Instagram and subscribe to our Telegram channel for the latest updates. KUALA LUMPUR June 27  The first two out of the 27 new train sets under the Kuala Lumpur Additional Vehicles 27 (KLAV27) project for the Kelana Jaya Light Rail Transit (LRT) line began operations yesterday after completing their testing and commissioning exercise. Prasarana, in a statement today said that the two sets of four-coach Bombardier Innovia Metro 300 trains are equipped with several enhanced features compared to the 14 sets of the same model trains used since 2018 and obtained under the KLAV14 initiative.

First two train sets under KLAV27 project begin operations

First two train sets under KLAV27 project begin operations 27 Jun 2021 / 15:00 H. Pix for representational purpose only. KUALA LUMPUR: The first two out of the 27 new train sets under the Kuala Lumpur Additional Vehicles 27 (KLAV27) project for the Kelana Jaya Light Rail Transit (LRT) line began operations yesterday after completing their testing and commissioning exercise. Prasarana, in a statement today said that the two sets of four-coach Bombardier Innovia Metro 300 trains are equipped with several enhanced features compared to the 14 sets of the same model trains used since 2018 and obtained under the KLAV14 initiative. “All the 27 sets of trains acquired under the RM1.7 billion KLAV27 project are equipped with several enhanced features in terms of their braking system, passenger doors, train management, auxiliary power supply system, and the introduction of Digital Route Map Display,” the statement said.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.