vimarsana.com

Latest Breaking News On - Cactus west - Page 8 : vimarsana.com

Arizona Sonoran Parks/Salyer Drilling Intersects 714 1 ft of 1 01% TCu and 0 90% Cu TSol

02.11.2022 - Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (“ASCU” or the “Company”) today releases assays from 3 drill holes from its 105,000 ft (32,000 m) infill to indicated drilling program at Parks/Salyer (“P/S ), located ~1.3 mi (2 km) .

Arizona Sonoran Cactus East Drilling Demonstrates Consistency of Mineralization; Intersects 148 5 ft of 2 57% TCu

13.09.2022 - Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (“ASCU” or the “Company”) releases 7 drill holes from the Cactus East, Cactus Mine Project infill drilling program. This new set of assays continue to support the previously defined .

Arizona Sonoran Cactus East Drilling Illustrates Continuity of Grade and Thickness, Drills 270 ft of 1 77% TCu

30.08.2022 - Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (“ASCU” or the “Company”) releases an additional 7 drill holes from the Cactus East, Cactus Mine Project infill drilling program. The current drill program is designed at 125 ft (38 m) .

Arizona Sonoran Announces Additional High-Grade Copper from Cactus and Completes PFS Drilling Program

Arizona Sonoran Announces Additional High-Grade Copper from Cactus and Completes PFS Drilling Program
newsghana.com.gh - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from newsghana.com.gh Daily Mail and Mail on Sunday newspapers.

Arizona Sonoran Drills 595 ft (181 4 m) of 1 29% CuT at Parks/Salyer and Increases Existing Private Land Package

ASCU drills two of the best holes to date on its properties, including: ECP-045: 595 ft (181.4 m) of 1.29% CuT, 1.18% TSol, 0.018% Mo (enriched) ECP-042: 86 ft (26.2 m) of 2.26% CuT, 2.11% TSol, 0.020% Mo (enriched) Including: 27 ft (8.2 m) of 4.22% CuT, 3.78% TSol, 0.019%…

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.