📰 Char Dham News
Page 41 - Char Dham News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Char Dham. Real-time updates on events, politics, business and more.
November 25, 2023
'The focus is now on vertical drilling and the operations may start in the next 24 to 36 hours as machines are being placed on a platform on top of the tunnel'
November 25, 2023
The National Disaster Management Authority on Saturday said that rescue operations at the Silkyara tunnel may take time with the auger machine facing repeated troubles and the focus is now on vertical drilling to bring out the 41 trapped workers. Briefing the media on the progress of rescue
November 25, 2023
SILKYARA: Rescuing 41 workers trapped in a highway tunnel in the Indian Himalayas for two weeks will take much...
November 25, 2023
From halting unsustainable development to gearing up for disaster management, there are lessons galore from man made ecological disasters in Uttarakhand
November 25, 2023
Get latest articles and stories on India at LatestLY. The National Disaster Management Authority on Saturday said that rescue operations at the Silkyara tunnel may take time with the auger machine facing repeated troubles and the focus is now on vertical drilling to bring out the 41 trapped workers. India News | Rescue Operation to Take Time to Bring out Workers Trapped in Silkyara Tunnel: NDMA.
November 25, 2023
Uttarakhand Tunnel Rescue Operation: The manual drilling of the collapsed tunnel will begin on Sunday
November 25, 2023
Rescuers are still struggling to reach the 41 construction workers almost two weeks after the 3 mile tunnel in Uttarakhand caved in.
November 25, 2023
The heavy machinery brought in to break through nearly 60 metres of debris was damaged and was being pulled out, officials said, adding that the last 10-15 metres will have to be broken with handheld power tools.
November 25, 2023
Saturday marked the 14th day since 41 labourers got trapped after a portion of an under-construction tunnel collapsed in Uttarakhand.
November 25, 2023
The NDMA member further said a very difficult operation is going on. Two methods are being used currently, but a third method that is drift method could also be used soon. Currently, 47-meter horizontal drilling has been completed, he said, adding the broken part of the auger machine has to be removed, and the drilled structure has to be kept stable.