📰 City Engineer Daniel News
City Engineer Daniel News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from City Engineer Daniel. Real-time updates on events, politics, business and more.
June 6, 2023
EASTHAMPTON — Public input from a March community meeting has been developed into concept designs in an effort to improve one of the city’s main thoroughfares, Main Street.As an introduction to those preliminary concepts for the now estimated $14.7...
September 3, 2022
EASTHAMPTON — The city is about to embark on the beginning stages of an estimated $13.9 million infrastructure project to redesign one of its main thoroughfares.Starting next week, land surveyors will be establishing the existing conditions on Main...
July 18, 2022
Trans-Systems is now getting the permitting to remove the superstructure of the 114-year-old former bridge that linked Fall River to Somerset.
January 25, 2021
North Ridgeville sewer line construction begins Updated Jan 25, 2021; Posted Jan 25, 2021 North Ridgeville is beginning a sanitary sewer extension project that will connect those with septic systems to the city sewer system. Facebook Share NORTH RIDGEVILLE, Ohio – A sure sign of the coming of spring is the gearing up of city construction projects. In North Ridgeville, a major sanitary sewer extension is already beginning. The city will be extending the sanitary sewer along Center Ridge Road...