In this post, we will introduce the concept of co-routines and how they are handled in PicoLisp. This will be the foundation for the subsequent posts on Discrete Event Simulation and finally a couple of examples, including an ASCII model railway simu.
A standard resource configuration is to allocate one cementing package for each rig, which does not utilise the capital-intensive cement unit resource optimally. The objectives of this study are to study the economic implications of the proposed call-out strategy, an implementation of the just-in-time philosophy and develop a discrete event simulation (DES) model improve operations' efficiency. To demonstrate the practicality of our model, three case studies with real collected data over a period of five years for a leading oil and gas company in the Gulf area were considered and the relationship between the optimal number of cementing units and the number of rigs was rigorously analysed: optimal number of cement units = 1.489 + 0.525 (number of rigs). Results indicate that optimisation of the cementing units and human resources can be achieved with effective resource reallocation to different rig configurations while considering realistic factors of capacity planning, efficiency
RPMGlobal - Mining Technology mining-technology.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from mining-technology.com Daily Mail and Mail on Sunday newspapers.
/PRNewswire/ TriMech, a leading provider of engineering design and additive manufacturing solutions, announced today it has acquired Adaptive Corporation.