📰 Flyover News
Page 49 - Flyover News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Flyover. Real-time updates on events, politics, business and more.
October 26, 2023
COIMBATORE: The Coimbatore city police booked three men for scaling an under-construction flyover in Ukkadam during a protest against Israel two days .
October 25, 2023
A large vehicle has rolled on Maunganui Rd near the Bayfair flyover. A police spokesman said police were called to the crash about 10.36am. There were no...
October 23, 2023
Delhi CM Kejriwal inaugurated a new three-lane flyover at Sarai Kale Khan, which will provide signal-free movement for commuters traveling from ITO to Ashram. | Latest News Delhi
October 23, 2023
This renovation will facilitate commuters by offering signal-free travel from ITO to Ashram. - Signal Free Drive From Delhi ITO To Ashram; 7 Things About Sarai Kale Khan Flyover
October 22, 2023
Kolar MP S Muniswamy said, “An action plan has been prepared to widen the road, addressing the existing blackspots. The project is estimated at Rs 4,200 crore, covering an elevated highway from KR Puram to Kolathur, featuring around 60-80 underpasses until Nagali (the border of Karnataka and Andhra Pradesh).”
October 22, 2023
The new half flyover at Sarai Kale Khan is 545 metres in length and consists of three lanes, ramps, stilt sections, and U-turn loops. The upper ramp is about 90 metres long, the lower ramp is 95 metres long, and the stilt section is approximately 360 metres., Delhi News, Times Now
October 22, 2023
Built at the cost of Rs 50 crore, the Sarai Kale Khan flyover has a length of 545 meters. The extension has three lanes, ramps, stilt sections, and U-
October 21, 2023
KATHMANDU, Oct 21: The government is going to build a flyover and a tunnel to ease the traffic jams at Koteshwar Chowk that has become an everyday problem in Kathmandu's traffic management. For this, the estimated cost is about Rs 25 billion.
October 19, 2023
It may be noted that the flyover has been constructed using SOPD fund involving a financial outlay of Rs. 316.11 crore. The total length of the flyover is 2.28 KM. The foundation of the flyover was laid on 29 January, 2022 and it was scheduled to be completed by 29 July 2024. However, the construction of the flyover has been completed in just 19 months.
October 17, 2023
The flyover will connect Juhu-Vile Parle Development Scheme circle to Mayor Hall on C D Barfiwala Road, reducing travel time from Juhu to WEH to just 10 minutes