China's another intelligent high-speed railway completed and put into use, Fuzhou to Xiamen in the fastest 55 minutes. The total length of the line is 277 kilometers, and the design speed is 350 kilometers per hour. At present, the line meets the requirements for safe and stable operation of high- speed railways and has the conditions for opening and operation. The line will be open within this year, and will form a new higher-standard rail channel to open on September 9.
China s first cross-sea high-speed railway, the Fuzhou-Xiamen-Zhangzhou High-speed Railway which connects Fuzhou and Zhangzhou in East China s Fujian Province, passed static acceptance testing on Friday, creating conditions for the opening of the line within the year.