The 44 batteries should be operational and online by August. (Holly Rusch / Special to the Business Times) By Holly Rusch Special to the Business Times GridStor, an Oregon-based energy firm focused on large-scale standalone battery energy storage projects, is installing 44 batteries in Goleta capable of storing enough power to keep the city running
Santa Barbara County Sheriff’s Office coroner deputies arrived on the scene and will be performing a coroner’s investigation and an autopsy to determine the cause of death.
The Student Health Services building, currently located on Ocean Road, will be demolished at an unspecified point in the future to accommodate new faculty housing.
The proposed lot would be moved to the other side of Ocean Road into a significantly smaller facility currently the ground parking lot next to the Parking Lot 22 structure.