Transcripts For SFGTV Government Access Programming 20240714

On the edge. Those are actually two maintenance buildings which we thought was a more visually pleasing public edge that weve located along gerald street. Here is an architectural rendering of what it will look like. Right down the middle youll see gerald street and those maintenance i talked about with solar panels and down the side the anaerobic digesters. Theyre concrete vessels, but also planned to what you see there for more of a visual esthetic, and then Energy Recovery as well. I also wanted to show you this just to provide you a snapshot from our actual design model because we did design it in a bama 3d model to get you to appreciate the complexity. I showed you the pretty aboveground structures. I want you to see what the contractor has to face. Basically when you look at this, all the different colors represent different waste streams, whether its treated and untreated sludge, wastewater, chemicals, all being laid adjacent to each other. Remember, im connecting to the existin

Transcripts For SFGTV Government Access Programming 20240714

Gerald street and those maintenance i talked about with solar panels and down the side the anaerobic digesters. Theyre concrete vessels, but also planned to what you see there for more of a visual esthetic, and then Energy Recovery as well. I also wanted to show you this just to provide you a snapshot from our actual design model because we did design it in a bama 3d model to get you to appreciate the complexity. I showed you the pretty aboveground structures. I want you to see what the contractor has to face. Basically when you look at this, all the different colors represent different waste streams, whether its treated and untreated sludge, wastewater, chemicals, all being laid adjacent to each other. Remember, im connecting to the existing Wastewater Treatment plant and i also wanted to point out you see those vertical looking piles on the bottom of each buildings, those are piles and based on the last count i got theres 132,000 piles to go along with the 220 cubic yards of soil tha

Transcripts For SFGTV Government Access Programming 20240714

The anaerobic digesters. Theyre concrete vessels, but also planned to what you see there for more of a visual esthetic, and then Energy Recovery as well. I also wanted to show you this just to provide you a snapshot from our actual design model because we did design it in a bama 3d model to get you to appreciate the complexity. I showed you the pretty aboveground structures. I want you to see what the contractor has to face. Basically when you look at this, all the different colors represent different waste streams, whether its treated and untreated sludge, wastewater, chemicals, all being laid adjacent to each other. Remember, im connecting to the existing Wastewater Treatment plant and i also wanted to point out you see those vertical looking piles on the bottom of each buildings, those are piles and based on the last count i got theres 132,000 piles to go along with the 220 cubic yards of soil that are going to be excavated. Remember the digesters in the buildings are 65feet tall, b

Transcripts For SFGTV Government Access Programming 20240714

Good afternoon. Im carolyn shoe and im the senior project manager for the biosolids digester facilities project. So the biosolids digester facilities project is the largest project in the sfip. Here is an aerial of the southeast plant. As you know, it is a critical portion of our infrastructure, providing treatment for close to 80 of the citys wastewater and stormwater, but also one of our oldest facilities. So the purpose of this project is to completely replace the aging facilities and construct new facilities adjacent to the existing plant as shown here in the blue outline. Basically through this project were rebuilding one half of the southeast plant. So with this project we have a rare opportunity in front of us to really build from the ground up, basically start off a blank page for these facilities. So basically were you know, we went through a robust planning process where we identified and addressed future and longterm operations and regulatory needs. We had applied modern, mo

Transcripts For SFGTV 20240622

None, next item please item 6 other commission business. Commissioners . Public comment clicks next item item 7, report of the general manager. Shift it so, the first item is mountain tunnel update. Steve ritchie. Good afternoon commissioner. Steve ritchie assistant general manager for what. Besides please . Ive a few slides to show thatll update us on the mountain tunnel project. First heres a schedule for the project that is hopefully clear and concise you can see the next two years a really critical ones for the mountain tunnel project it really three components. The mountain tunnel access improvements, which is getting in there and improving access to the tunnel itself through the roadway access points. The second is the mountain tunnel inspection and repair program, which provides for a significant inspection of the tunnel in early 2017. With some repairs done in 2017 and significant repairs in 2018. Lastly down tunnel bypass project. Whats important to note there is that it shows