📰 Libra Consortium News
Page 6 - Libra Consortium News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Libra Consortium. Real-time updates on events, politics, business and more.
December 17, 2021
December 17, 2021 SBM Offshore is pleased to announce that it has secured a US$620 million bridge loan facility for the financing of the construction of FPSO Alexandre de Gusmão. The FPSO Alexandre
November 30, 2021
November 30, 2021 SBM Offshore is pleased to announce it has signed contracts with Petróleo Brasileiro S.A. (Petrobras) for the 22.5 years lease and operation of FPSO Alexandre de Gusmão. These
November 30, 2021
FPSO operator SBM Offshore has signed contracts with Petrobras for the 22.5 years lease and operation of FPSO Alexandre de Gusmão.
November 30, 2021
SBM Offshore has signed contracts with Petrobras for the 22.5 years lease and operation of FPSO Alexandre de Gusmão for work offshore Brazil.
November 30, 2021
Brazilian oil company Petrobras has signed contracts with the Dutch FPSO specialist SBM Offshore for the chartering and provision…
November 20, 2021
Aker Solutions has been awarded a substantial contract by Petrobras to provide a subsea production system and related services for the Mero 4 project offshore Brazil. This is the fourth consecutive production system for the Mero field development, one of the largest oil discoveries in Brazils pre-salt area.
November 19, 2021
Petrobras has awarded a contract to Aker Solutions to provide a subsea production system for the Mero 4 project offshore Brazil.
October 29, 2021
A complete subsea factory may yet be a pipe dream. However, with its constituent parts now more or less ready, the industry…
May 30, 2021
ZeroHedge - On a long enough timeline, the survival rate for everyone drops to zero
May 25, 2021
Subsea 7 secures subsea equipment supply contract from Petrobras 25 May 2021 (Last Updated May 25th, 2021 12:56) Subsea 7 has secured a contract from Petrobras to deliver subsea equipment for the Mero-3 field development project offshore Brazil. Share Article The Mero-3 field is planned to be developed through the FPSO. Credit: Pexels / Pixabay. Petrobras has awarded Subsea 7 a ‘very large’ contract to deliver subsea equipment for the Mero-3 f...