📰 Main Programme Dates News
Main Programme Dates News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Main Programme Dates. Real-time updates on events, politics, business and more.
March 15, 2021
Roadworks in Herefordshire, this March Menu HIGHWAY RESURFACING WORKS – ROAD CLOSURES Resurfacing works (including white lining and stud works, if required) as well as any preparatory works (i.e. drainage, kerbing) if required. C1091 – Venmore Lane, Dilwyn Road closed 09.00 hours to 17.00 hours daily No weekend working Thursday, 11 March to (and including) Monday, 15 March 2021 Road closed 09.00 hours to 17.00 hours daily U73209 – Stoney Street, Madley Road c...
February 12, 2021
Road closed 09.00 hours to 17.00 hours daily BRIDGE WORKS Road closed Monday, 8 March 2021 to (and including Wednesday, 17 March 2021 Full 24/7 closure: Road closed from 09.00 hours on Monday, 8 March and does not re-open until 17.00 hours on Wednesday, 17 March 2021 Parapet wall repair following RTC C1219 Allt-yr-ynys Bridge, Walterstone Road closed 09.30 hours to 15.00 hours each day Repairing surface dame to Bridge/voussoirs and repointing C1185 - Bredwardine Bridge - New M...
February 12, 2021
Road closed 09.00 hours to 17.00 hours daily BRIDGE WORKS Road closed Monday, 8 March 2021 to (and including Wednesday, 17 March 2021 Full 24/7 closure: Road closed from 09.00 hours on Monday, 8 March and does not re-open until 17.00 hours on Wednesday, 17 March 2021 Parapet wall repair following RTC C1219 Allt-yr-ynys Bridge, Walterstone Road closed 09.30 hours to 15.00 hours each day Repairing surface dame to Bridge/voussoirs and repointing C1185 - Bredwardine Bridge - New ...
January 20, 2021
Highway resurfacing works- road closures Resurfacing works (including white lining and stud works, if required) as well as any preparatory works (i.e. drainage, kerbing) if required. C1094 – Outside Weobley High School, Weobley – Revised works Thursday, 21 January 2021 and Friday, 22 January 2021 – Resurfacing Works Road closed 09.30 hours to 15.30 hours each day Monday, 25 January 2021 to (and including) Friday, 29 January 2021 – Preparatory Works Traffic signals in operation...