Southeast considers 3 options for new school funded by Rover pipeline
Three school building options to consider for Southeast Local Here are the three options to be discussed: Pre-kindergarten through sixth-grade building at a cost of $29,543,750. Pre-kindergarten through eighth-grade building at a cost of $38,243,750. Pre-kindergarten through 12th-grade building at a cost of $50,831,490. Each option would come with a plan for existing buildings. In a pre-K-12 building grade levels would be configured in two or three separate areas. The design would be grade appr...
Source: the-daily-record.com