With this new technology, electricity towers can now be constructed by making a pile foundation even inside rivers. Previously, installing high-voltage lines between two banks of the river used to be a big challenge before MPPTCL.
"The cost efficiency of drones is being studied and if viable, it would be used permanently. Our engineers have been supervising its operations since January," Managing Director of MPPTCL Sunil Tiwari said.