together the toll here is that over 150 lives have been lost, 10,000-plus structures destroyed all because a utility does not have in place a power safety shutoff system. and it is so easy to do. pg&e was able to put it together, you can imagine this, within eight months of the 2017 fires and that program had been in existence since 2010 in san diego. and what they consider to be inaccurate reporting by the washington post on compromised evidence. it says since august 8th, they have taken significant steps to