KUCHING (Nov 16): A total of 80 development projects with a ceiling cost of RM368.6 million in Serian Division are expected to be completed by the end of the 12th Malaysia Plan (12MP) or during the Mid-Term Review (MTR) of the plan.
Sarawak Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg sa