vimarsana.com

Latest Breaking News On - President subsea - Page 1 : vimarsana.com

TechnipFMC: awarded a significant contract by bp -January 17, 2024 at 09:25 am EST

TechnipFMC announces that it has been awarded a significant contract by bp for the Mad Dog field extension project. As a reminder, TechnipFMC uses the term significant for contracts between $75 and.

Bp: TechnipFMC selected for Mad Dog field extension project -January 17, 2024 at 09:53 am EST

TechnipFMC announces that it has been awarded a significant contract by bp for the Mad Dog field extension project.As a reminder, TechnipFMC uses the term significant for contracts between $75 and.

TechnipFMC plc: TechnipFMC Awarded First iEPCI in Brazil for the Karoon Patola Field

TechnipFMC (NYSE:FTI) (PARIS:FTI) (ISIN:GB00BDSFG982) today has been awarded its first integrated Engineering, Procurement, Construction and Installation (iEPCI) contract in Brazil by Karoon Energy (ASX:KAR)

TechnipFMC wins first iEPCI contract offshore Brazil

TechnipFMC wins first iEPCI contract offshore Brazil June 3, 2021, by Nadja Skopljak TechnipFMC has won its first integrated engineering, procurement, construction and installation (iEPCI) contract in Brazil by Karoon Energy for the Patola field. The contract covers engineering, procurement, construction and installation of subsea trees, flexible pipes and umbilicals. The project will take place at water depths of 300 meters and will tie back to the existing Baúna floating production, storage and offloading (FPSO) vessel Cidade de Itajaí. Delivery and installation of the equipment are scheduled for the second half of 2022, with first oil production targeted for the first quarter of 2023.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.