POTSDAM — A resolution to spend $40,000 toward an engineering study for major upgrades to Pine Street Arena that had previously failed to pass the village board got a second
POTSDAM — A resolution to spend $40,000 toward an engineering study for major upgrades to Pine Street Arena failed to pass at Monday’s village board meeting. However, it will likely