CHIEF Minister Datuk Seri Hajiji Noor said a RM4 billion Hydroelectric Dam will be built at Ulu Padas in Tenom as a long-term solution to the water shortage in Sabah.
THE State Government is focused on ramping up digitalisation efforts to maximise the potential of the digital economy, said Chief Minister Datuk Seri Hajiji Noor.
PAPAR: Sabah’s longstanding water supply problem is expected to be resolved through the Ulu Padas Dam in Tenom costing RM4 billion, work on which is scheduled to start in October and to be completed in 2027.
PAPAR, Aug 25 A RM4 billion hydroelectric dam will be built at Ulu Padas, Tenom as a long-term solution to the state’s perennial water shortage, said Sabah Chief Minister.
KOTA KINABALU: A RM4bil hydroelectric dam will be built in Sabah’s interior Tenom district as a long-term solution to the state’s chronic water supply problem, says Datuk Seri Hajiji Noor.