📰 Sofec Inc News
Sofec Inc News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Sofec Inc. Real-time updates on events, politics, business and more.
January 15, 2024
The FPSO Errea Wittu will have the capacity to store 2 MMboe. It will produce approximately 250,000 bopd and will have gas treatment capacity of 540 MMcfd, and water injection capacity of 350,000 bpd.
January 12, 2024
Jumbo has been awarded a contract by MODEC for the pre-installation of the mooring spread of the FPSO, which will be located offshore Guyana
January 11, 2024
Jumbo Offshore Installation Contractors B.V. (“Jumbo Offshore”) has been awarded a contract by MODEC Guyana Inc. (“MODEC”) for the pre-installation of...
August 21, 2023
MODEC’s FPSO Anita Garibaldi MV33 has achieved First Oil production.Deployed for production operations at the Marlim field…
August 21, 2023
MODEC’s FPSO Anita Garibaldi MV33 has achieved First Oil production.Deployed for production operations at the Marlim field…
June 9, 2023
The FPSO is capable of processing 150,000 barrels of crude oil per day and 6,000,000 m3 of gas per day
June 5, 2023
MODEC has announced that the FPSO Almirante Barroso MV32, deployed for production operations at the Búzios field in the giant pre-salt region of the Santos Basin off the coast of Brazil, achieved First Oil production on May 31, 2023. The FPSO is leased on a 21-year time charter contract to Petrobras.
May 25, 2023
Offshore Mooring Market is Expected to Reach $1.8 Billion by 2031—Allied Market Research
May 10, 2023
MODEC has signed a Sales and Purchase Agreement (SPA) with Equinor Brasil Energia, a subsidiary of Equinor, to supply a Floating Production, Storage and Offloading (FPSO) vessel to produce the field cluster of Pao de Acucar, Seat & Gavea in the BM-C-33 block of the Campos Basin offshore Brazil.
May 10, 2023
Japanese FPSO supplier MODEC has won a contract with Equinor to supply an FPSO vessel for the BM-C-33 block of the Campos Basin offshore Brazil…