vimarsana.com

Page 3 - Subsurface Dynamics Inc News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Empire Energy Group Ltd (ASX:EEG) Material Increase in Carpentaria-2H IP30 Flow Rates

Empire Energy Group Ltd (ASX:EEG) (OTCMKTS:EEGUF) announce that Carpentaria-2H ( C-2H ) has achieved a new average flow rate over 30 days ( IP30 ) of 2.81 mmscf per day, equating to a normalized flow rate of over 3 mmscf per day per 1,000m of horizontal section.

Empire Energy Group Ltd boosts average 30-day flow rate from Carpentaria-2H to 2 81 million standard cubic feet of gas

Empire Energy Group Ltd (ASX:EEG) Beetaloo Flow Testing and Operations Update and Conference Call

Empire Energy Group Ltd (ASX:EEG) (OTCMKTS:EEGUF) report that the Carpentaria-3H ( C-3H ) has been flow tested for 27 days and is currently shut in for soaking (the practice of shutting in a well for a period following fracture stimulation to maximise long-term productivity).

Tamboran Resources Limited (ASX:TBN) Operational Update - EP 161 Tanumbirini 2H and 3H Flow Rates

Tamboran Resources Limited (ASX:TBN) announce that the Tanumbirini 2H and Tanumbirini 3H wells drilled in Northern Territory permit EP 161 have delivered gas to surface from the Mid-Velkerri B shale of the Beetaloo Sub-basin over an initial 30-day period.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.