vimarsana.com

Page 3 - West Cache Project News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Galleon Gold Corp : Galleon Gold Reports 6 1 g/t Gold over 15 Meters at West Cache Project

Galleon Gold Corp.: Galleon Gold Reports 6.1 g/t Gold over 15 Meters at West Cache Project Zone #9 - continued definition of grade and mineralization WC-21-172 intersected 6.1 g/t Au over 15.0 m (230 to 245 m) including 9.89 g/t Au over 7.0 m (231 to 238 m); true thickness of these intervals is estimated at 98% of the reported intercept length WC-21-191 intersected 13.83 g/t Au over 2.0 m (192 to 194 m); true thickness of these intervals is estimated at 94% of the reported intercept length Hole WC-21-172, located mid-way between previously announced holes WC-20-30 (7.16 g/t Au over 9.7 m) and WC-20-42 (7.44 g/t Au over 10.7 m), provides additional confirmation of grade/thickness in a key portion of the Zone #9 mineralized shoot located 150 to 200 m below surface (see press releases dated September 9 and 29, 2020). Assays and geologic data from Hole 172 will be important for the modeling and resource work now underway as part of the Company s upcoming Preliminary Economic As

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.