vimarsana.com

Latest Breaking News On - Woods pond dam - Page 1 : vimarsana.com

The first stretch of PCB cleanup in Pittsfield will look much different than the work done 20 years ago, the EPA says

U.S. Environmental Protection Agency officials and engineers explained Wednesday night in a public session at Herberg Middle School that the Reach 5A cleanup and restoration won’t look like that initial

In addition to water, these two Housatonic dams are holding back PCBs A consultant has instructed to GE to run a dam break analysis

An engineering consultant has required General Electric Co, to prepare new “dam break analysis” reports on the Woods Pond and Rising Pond dams by the end of the year, according

Comfort letters assured Pittsfield landowners they would not be on the hook for future PCB cleanups Will downriver neighbors get a similar break?

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.