vimarsana.com

Page 13 - ஏ அம்ப்ப செய்தி News Today : Breaking News, Live Updates & Top Stories | Vimarsana

India: GE Renewable Energy and Continuum Green Energy sign large wind power project in India

India: GE Renewable Energy and Continuum Green Energy sign large wind power project in India 17 Jun 2021 The 148.5 MW wind farm to power the equivalent of 125,000 households in India Continuum Green Energy to supply, install and commission 55 sets of its 2.7-132 onshore wind turbines for the 148.5 MW Morjar, Bhuj wind farm in Gujarat, India. The project was won by Continuum Green Energy during the tranche-VI auction of wind projects by Solar Energy Corporation of India and will produce enough green energy to power 125,000 households in India. This is another success for GE’s 2.7-132 wind turbine which has proven to be the technology of choice for customers in India due to its industry leading performance at India’s low wind speeds. The supply for this project will leverage GE’s significant local footprint in India with product design primarily at GE’s Technology Center in Bengaluru, blades manufactured in GE’s plants in Vadodara and assembly at the GE Multi-modal M

Poland: Vestas receives 108 MW order in Poland from DIF Capital Partners

Poland: Vestas receives 108 MW order in Poland from DIF Capital Partners 14 Jun 2021 DIF Capital Partners for four projects in Poland, all awarded in Poland’s second auction round from 2019, cumulatively totalling 108 MW in capacity. The four projects are Pruszcz (70 MW), Markowice (26 MW), Piaski (8 MW) and Wyszki (4 MW). The Pruszcz and Markowice projects are located in Kujawsko-Pomorskie Voivodeship, while the Piaski and Wyszki projects are situated in Wielkopolskie Voivodeship. Across the four projects Vestas will supply and install 52 V100-2.0 MW turbines, as well as two V90-2.0 MW turbines. These orders build on the more than 2.6 GW of installed wind capacity that Vestas has already delivered in Poland.

Brazil: Petrobras signs contract for the supply of eighth Buzios unit

Petrobras has signed a contract with the joint venture formed by Saipem and DSME in the amount of US$ 2.3 billion for the supply of P-79, the eighth unit to be installed in Buzios field, in the Santos Basin pre-salt area. The delivery is scheduled for 2025.

UK: Drax and Mitsubishi Heavy Industries sign pioneering deal to deliver the world s largest carbon capture power project

UK: Drax and Mitsubishi Heavy Industries sign pioneering deal to deliver the world’s largest carbon capture power project 14 Jun 2021 Agreement combines pioneering UK innovation and Japanese technology with the potential to deliver the largest deployment of negative emissions in power generation anywhere in the world, supporting the UK government’s ambitious target to reduce carbon emissions and enabling clean growth and green jobs. Bioenergy with carbon capture and storage (BECCS) at Drax can enable the renewable energy company to become carbon negative by 2030 – permanently removing more CO2 from the atmosphere than is emitted across its operations. Mitsubishi Heavy Industries to develop new centre of excellence for Carbon Capture and Use and Storage (CCUS) in London as well as looking at ways to strengthen its supply chain, including the potential production of its proprietary solvent in the UK.

Canada: Wood extends partnership on Hibernia in Eastern Canada

Canada: Wood extends partnership on Hibernia in Eastern Canada 14 Jun 2021 Wood will build upon its long-standing partnership with Hibernia Management and Development Company (HMDC) following the renewal of a major contract to provide engineering, procurement, and construction (EPC) solutions and maintenance to the Hibernia platform off the coast of St. John’s, Newfoundland and Labrador. With the five-year extension agreement, Wood will continue to employ up to 300 people on the contract, which it has been supporting as the incumbent contractor for these services since first oil in 1997. This renewal demonstrates the strength of our relationship with HDMC and ongoing support of the Hibernia offshore platform developed over the last two decades

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.