vimarsana.com

Latest Breaking News On - தரவரிசை உறுப்பினர் ஆன் பாராளுமன்றம் - Page 1 : vimarsana.com

Lack of dynamism from GRIDCo caused power cuts – Mutawakilu

Lack of dynamism from GRIDCo caused power cuts – Mutawakilu LISTEN MAR 8, 2021 A former Ranking Member on Parliament’s select committee on Mines and Energy, Adam Mutawakilu, says the Ghana Grid Company s (GRIDCo) inability to adjust its system in response to power supply challenges in the Western Region led to Sunday s nationwide power cuts. In an interview with Citi Business News, Mr. Mutawakilu highlighted the need for a dynamic system to effectively respond to such challenges, as well as the need for a constant supply of fuel to emergency plants to enable them supply power in times of such challenges. “Whenever there is this fault in generation, there is the need for other generating plants to come on board. When this thing happened, there was the need to quickly cut off some areas so that the load balance will be there,” he explained.

Dumsor to return if gov t refuses to take over Ameri plant — IES warns

Dumsor’ to return if gov t refuses to take over Ameri plant IES warns LISTEN FEB 2, 2021 The Institute of Energy Security (IES) has predicted a complete shutdown in power supply in Ghana following the lack of preparedness by government to take over the Ameri Power deal. The Ameri deal was signed by the government in 2015 at a total cost $510 million to provide 230 megawatts of power for five years. This was done to assist in resolving the power crisis at the time. Although Ameri Energy wrote in September 2020 to inform the government of its intention to hand over the plant by the date stated in the contract, the government of Ghana has not yet carried the necessary steps to ensure a smooth handing over.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.