vimarsana.com

Page 6 - தேசிய உயர் வேகம் ரயில் நிறுவனம் வரையறுக்கப்பட்டவை News Today : Breaking News, Live Updates & Top Stories | Vimarsana

NHSRCL starts LiDAR survey for Mumbai-Nagpur high-speed rail project

The National High Speed Rail Corporation Limited (NHSRCL) on Friday launched an aerial LiDAR survey to prepare the detailed project report (DPR) for the proposed 736 km Mumbai-Nagpur high-speed rail (HSR) corridor.The proposed Mumbai-Nagpur HSR .

Pact Signed With Japanese Firm For Track Work In Bullet Train Project

Pact Signed With Japanese Firm For Track Work In Bullet Train Project Pact Signed With Japanese Firm For Track Work In Bullet Train Project The Memorandum will strengthen the ties between India and Japan, and will also give a boost to Make in India initiative. The Japan firm will provide the detailed design and drawing of major track components. (File) New Delhi: The National High Speed Rail Corporation Limited (NHSRCL) on Friday signed an MoU with a Japanese firm for track work of the 237-km stretch between Vadodara and Vapi in Gujarat for the Mumbai-Ahmedabad bullet train project. The Japan Railway Track Consultant Co. Limited (JRTC) will provide the detailed design and drawing of major HSR track components like RC track bed, track slab arrangement and continuous welded rail (CWR) forces and other essentials to the railways, according to a statement.

Mumbai-Ahmedabad Bullet Train Project: NHSRCL Signs MoU With Japanese Firm For Designs Of High-Speed Rail Track Works

Mumbai-Ahmedabad Bullet Train Project: NHSRCL Signs MoU With Japanese Firm For Designs Of High-Speed Rail Track Works by Swarajya Staff - Mar 12, 2021 11:34 AM A bullet train (Photo via NHRSCL Website) The National High Speed Rail Corporation Limited (NHSRCL) on Friday (12 March) signed a memorandum of understanding (MoU) with a Japanese firm for track works of the Mumbai-Ahmedabad bullet train project. The NHSRCL is the implementing agency for the 508-km Mumbai-Ahmedabad High Speed Rail (MAHSR) project, also known as the bullet train project. The agency signed the MoU with Japan Railway Track Consultant Company (JRTC) for the designs of High-Speed Rail track works for the T2 package (237 km between Vadodara to Vapi in Gujarat) of the project.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.